Most of the time, the ground feels solid beneath our feet. That's comforting. But it's also m...

查看本题答案

你可能感兴趣的试题

Scope, time, cos  Time, scope, cos  Cost, time, scop  None of the abov  
on time    at a time    at times    all the time  
on time    at a time    at times    all the time  
killing time          to kill time   spending the time       to spend the time  
at that time    by that time    at which time    by which time

  
killing time    to kill time    spending the time    to spend the time  
killing time     to kill time   spending the time    to spend the time  
killing time           to kill time      spending the time        to spend the time  
at a time    all the time    from time to time    on time  
at times    at a time    in no time    at one time  
fewest, most    least, most    fewest, more    less, most  
SD=(b-a)/6  SD=b-a/6  SD=(a-b)/6  SD=(b-a)/12  Note: The definitions of a=most optimistic time and b=most pessimistic time. Use the following information for questions 10 and 11 for the following is duration data related to an activity in a time scale network.  Optimistic time=a=10 days  Pessimistic time=b=20 days  Most likely time=m=12 days  
killing time           to kill time      spending the time        to spend the time        
study  to study  studying  studies  
at that time    by that time    at which time    by which time  
(a+3m+b)/6  (a+4m+b))/6  (a+5m+b)/6  (a+m+b)/3  Note: A major assumption for all network methods is that activity durations are statistically dependent and where a=most optimistic time, b=most pessimistic time, m=most likely time.  
study   to study   studying   studied  
at a time    all the time   from time to time    on time  
once or twice   one time or two time   once time or twice   once or two time  
at times    at a time    in no time    at one time  

热门试题

更多