你可能感兴趣的试题
Scope, time, cos Time, scope, cos Cost, time, scop None of the abov
on time at a time at times all the time
on time at a time at times all the time
killing time to kill time spending the time to spend the time
at that time by that time at which time by which time
killing time to kill time spending the time to spend the time
killing time to kill time spending the time to spend the time
killing time to kill time spending the time to spend the time
at a time all the time from time to time on time
at times at a time in no time at one time
fewest, most least, most fewest, more less, most
SD=(b-a)/6 SD=b-a/6 SD=(a-b)/6 SD=(b-a)/12 Note: The definitions of a=most optimistic time and b=most pessimistic time. Use the following information for questions 10 and 11 for the following is duration data related to an activity in a time scale network. Optimistic time=a=10 days Pessimistic time=b=20 days Most likely time=m=12 days
killing time to kill time spending the time to spend the time
study to study studying studies
at that time by that time at which time by which time
(a+3m+b)/6 (a+4m+b))/6 (a+5m+b)/6 (a+m+b)/3 Note: A major assumption for all network methods is that activity durations are statistically dependent and where a=most optimistic time, b=most pessimistic time, m=most likely time.
study to study studying studied
at a time all the time from time to time on time
once or twice one time or two time once time or twice once or two time
at times at a time in no time at one time