The faying surfaces are coated with white lead (or similar product )before the rivets are set A sealing weld bead of 1/or less pitch is run along the plate edge The plate edge is split close to an adjacent plate and mechanically forced into contact withthe adjacent plate A properly riveted joint will be watertight; any leakage is stopped by setting up on therivets"