当前位置: X题卡 > 所有题目 > 题目详情

To avoid the various foolish opinions to which man is liable, no superhuman genius is required. A...

查看本题答案

你可能感兴趣的试题

An emergency stop of the main engine to avoid a collision.  An emergency reversal operation of the main engine to avoid a collision.  An stop of the main engine to avoid a collision.  A reversal operation of the main engine to avoid a collision."  
varieties of; various  a plenty of; many  various; many a  quite a few; quite a little  
avoid lose their job    avoid firing    avoid being fired    avoid to be fired  
avoid mentioning    to avoid mentioning    avoiding to mention    avoiding mentioning  
avoid using liquid-cooled nozzles whenever possible  avoid low cooling water temperatures  avoid prolonged overloading of the engine  make certain the gasket seal between the nozzle and cylinder head is tight  
Changes are generally not predictable,therefore planning for change management cannot be sensibl  Planning for change management should be done while the various change control processes are being applie  Change management can be planned in a set of management plans or a specific change management pla  Changes are a sign of bad planninOne should avoid changes during a project thus eliminating the need to manage the  
avoid lose their job    avoid firing    avoid being fired    avoid to be fired  
Various if    Various as    So various    More various  
Changes are generally not predictable, therefore planning for change management cannot be sensible  Planning for change management should be done while the various change control processes are being applied  Change management can be planned in a set of management plans or a specific change management plan  Changes are a sign of bad planning. One should avoid changes during a project thus eliminating the need to manage them  
avoid mentioning  to avoid mentioning   avoiding to mention  avoiding mentioning  
avoid    avoiding    avoided    to avoid  
To avoid being seen    Avoiding seen    Avoid being seen    Avoided seeing  
strong matrix  balanced organization  composite  balanced matrix  
avoid to make    avoid making    to avoid to make    to avoid making  
avoiding to lose    to avoid losing    avoiding losing    to avoid to lose  
avoid wasting; will have finished    to avoid wasting; has finished    avoid wasting; have finished    to avoid wasting; have finished  
avoid knocking  avoiding to knock   to avoid knocking  to avoid to knock  
avoid using  avoid to use  has avoided using  avoids to use  

cover all project risks by buying appropriate insurance  ignore the risks, since nothing can be done about them and move forward with the project in an expeditious manner  avoid projects with clear and present risk  identify various risks and implement actions to mitigate their  

avoid talking   to avoid talking   avoid to talk   to avoid to talk  

热门试题

更多