during transmission in the display or printing on the user's equipment in converting to other software formats in air mail delivery to the readers"
Risk identification Quantitative risk analysis Plan risk responses Risk monitoring and control
the sub-project level the level determined by the project office a level allowing for adequate estimates the cost center level
Hardware such as logistics facilities and equipment (logistics carriers) are needed Information control and standardization Supports from the government and logistics association All of them
project schedule network diagrams activity attribute updates requested changes milestone list
develop project charter create WBS estimate costs sequence activities
Inventory Store Stock Storage of logistics
The process of developing the future trends along with the assessment of probabilities, uncertainties, and inflation that could occur during the project. The process of assembling and predicting costs of a project over its life cycle. The process of establishing budgets, standards, and a monitoring system by which the investment cost of the project can be measured and managed. The process of gathering, accumulating, analyzing, monitoring, reporting, and managing the costs on an on-going basis.
the running-in period the running process gas exchange process the boiler firing
in which during where in what in where
logical models physical models design models implementation models
in which during where in what in where
the conceptual phase the planning process project implementation risk identification
boiling off flash evaporation condensation none of the above