当前位置: X题卡 > 所有题目 > 题目详情

. It is required that each of the students chosen _________ good preparations ahead of timE.

查看本题答案

你可能感兴趣的试题

bandwidth  efficiency  availability  delay  
when the remaining charge volume is less than 90 percent of the required VOLUME  at each inspection for certification  at each annual inspection  when the weight loss exceeds 10% of weight of charge  
are; is    are; are    is; are    is; is  
1atency  throughput  utilization  jitter  
adaptability  scalablity  route  security  
flow  hop  process  route  
flow  window  route  cost  
process  hop  route  flow  
flow  hop  process  route  
packet  throughput  error  number  
It is a deliverable or project work component at the lowest level of each branch of the work breakdown structure  It is a summary task at the top level of the WBS  It includes the schedule activities required for completion of the deliverable or project work component  It includes the schedule milestones required for completion of the deliverable or project work component  
bandwidth  efficiency  availability  delay  
adaptability  scalablity  route  security  
cost  link-state  connection  diagram  
1atency  throughput  utilization  jitter  
until each quadrennial PSC inspection  until the end of each voyage  for a minimum of one year  for a minimum of two years  
It is a deliverable or project work component at the lowest level of each branch of the work breakdown structur  It is a summary task at the top level of the WB  It includes the schedule activities required for completion of the deliverable or project work componen  It includes the schedule milestones required for completion of the deliverable or project work componen  

热门试题

更多