当前位置: X题卡 > 所有题目 > 题目详情

A.measure B.health C.theatre D.ready

查看本题答案

你可能感兴趣的试题

fit, healthy   health, healthy.    heath, fit    fit, health  
measure   access   way   method  
measure, delay, record, distribute, analyze, and direct  plan, schedule, monitor, control, report, and forecast  promote, highlight, monitor, control, forecast, and report  emphasize, visualize, analyze, conceptualize, report, and record  
measure, delay, record, distribute, analyze, and direct  plan, schedule, monitor, control, report, and forecast  promote, highlight, monitor, control, forecast, and report  emphasize, visualize, analyze, conceptualize, report, and record  
health , health   health , healthy   healthy , health   healthy, healthy  
measure equipment  main electrical  my engine  main engine  
Measure ID  UE发射功率  邻区PCI  上行BLER  
measure   attempt   purpose   being passed  
MEASURE REPORT  ASSIGN REQUEST  ASSIGN COMLETE  CONNECTED ACK  
measure accurately the flow rate of the refrigerant-mass at that point  compress and heat the refrigerant vapor  bring about the evaporation and cooling of refrigerant  exchange heat between the refrigerant and the air at that point  
measure   attempt   purpose   desire  
Access to timely and effective health care.  Happening of fatal cases.  Preventable deaths.  The fund it receives.  

热门试题

更多