schedule planning deputize contract term criterion
plan were planning had planned are planning
for which with which by which on which
Scope base line Cost of quality Product specification Quality checklist
plan planning being planned planned
finishing finished had finished were finishing
Changes are generally not predictable, therefore planning for change management cannot be sensible Planning for change management should be done while the various change control processes are being applied Change management can be planned in a set of management plans or a specific change management plan Changes are a sign of bad planning. One should avoid changes during a project thus eliminating the need to manage them
take on take up take in take over
planned were planning plan have planned
planned were planning plan have planned
Scope base line Cost of quality Product specification Quality checklist