你可能感兴趣的试题
planning element work package subtask working interface
refuses to accept the change since the scope has been verified modifies the WBS and the decomposition accepts the change and incorporates it into the WBS, modifying the budget and the schedule and assigning accountability to the marking team proceeds per the change process
The deliverable or subproject is very complicate The deliverable or subproject is already being produce The deliverable or subproject will be accomplished after a very long time ( far into the futu None of the above: Decomposition of deliverables is always possibl
mark picture symbol notation
instance example existence implementation
control inheritance inference connection
instance example existence implementation
planning element work package subtask working interface
data inheritance functional decomposition object abstraction information generalization
mark picture symbol notation
problem solution data program
problem solution data program
mark picture symbol notation
data inheritance functional decomposition object abstraction information generalization
The deliverable or subproject is very complicated. The deliverable or subproject is already being produced. The deliverable or subproject will be accomplished after a very long time (i. e. far into the future). None of the above: Decomposition of deliverables is always possible.
control program data reference