当前位置: X题卡 > 试卷库 > 英语 > 单项选择

单项选择

推荐等级:

发布时间: 1970-01-01

扫码用手机做题

试卷预览

1最佳选择题 3分

Aftera300millionyuanrenovationprojectLidaiDiwan

  • A. The renovation project cost 300 million yuan.
  • B. The temple was once a part of Beijing No. 159 Middle School.
  • C. Those parts of the temple too destroyed to repair are still there.
  • D. The temple is located on the north side of Fuchengmennei Daji
查看答案

正确答案: -

本题解析: 暂无解析

2最佳选择题 3分

Aftera300millionyuanrenovationprojectLidaiDiwan

  • A. The temple has a long history.
  • B. The temple is to the east of Baitasi.
  • C. The bricks in the temple are not so valuable as those in the Forbidden city.
  • D. The renovation was done according to the orders of Emperor Qianlon
查看答案

正确答案: -

本题解析: 暂无解析

3最佳选择题 3分

Aftera300millionyuanrenovationprojectLidaiDiwan

  • A. 470 years.
  • B. 159 years.
  • C. 71 years.
  • D. 188 years.
查看答案

正确答案: -

本题解析: 暂无解析

4最佳选择题 3分

Aftera300millionyuanrenovationprojectLidaiDiwan

  • A. The temple is still not reopened yet to the public.
  • B. The jinzhuan bricks were made in Hangzhou for imperial use.
  • C. The jinzhuan bricks were used to pave the wall in the temple.
  • D. The temple was at first constructed 470 years ago.
查看答案

正确答案: -

本题解析: 暂无解析

5最佳选择题 3分

Aftera300millionyuanrenovationprojectLidaiDiwan

  • A. Reform
  • B. . Rearrange.
  • C. Retreat.
  • D. Restor
查看答案

正确答案: -

本题解析: 暂无解析

其他考生还关注了

更多
  • 填空

    试卷分类:英语

    练习次数:0次

  • 填空

    试卷分类:英语

    练习次数:2次

  • 填空

    试卷分类:英语

    练习次数:2次

  • 填空

    试卷分类:英语

    练习次数:0次

  • 填空

    试卷分类:英语

    练习次数:0次

  • 填空

    试卷分类:英语

    练习次数:1次

  • 填空

    试卷分类:英语

    练习次数:1次

  • 填空

    试卷分类:英语

    练习次数:0次