当前位置: X题卡 > 所有题目 > 题目详情

The construction of the railway is said to have been terminated.

查看本题答案

你可能感兴趣的试题

resumed  ended  suspended  cancelled  
Hard alloy steel construction  Beveled edges on the valve head  Low alloy steel construction  Poppet type design  
instruction  destruction  conduction  building  
opposition.  indifference.  approval.  suspicion.  
use  usage  activity  construction  
Such construction robots are clever   So clever the construction robots are   Such clever construction robots are   So clever are the construction robots  
operation  installation  display type  construction  
below  under  by  with  
A critical resource went on sick leave for a long period of time, which had not been anticipated earlie  The Cost of raw materials required for construction increased 10%.  You had not taken into account inflation rat  There was 4 days waiting time in the curing of cement, and work could not be done during that tim  
pay  paying  paid  to pay  
A critical resource went on sick leave for a long period of time, which had not been anticipated earlier.  The Cost of raw materials required for construction increased 10%.  You had not taken into account inflation rate.  There was 4 days waiting time in the curing of cement, and work could not be done during that time.  
agreement  construction  threat  consideration  
in the process of  in the process for  on the process of  on the process for  
operation  installation  display type  construction"  
comparison    association    touch    construction  

热门试题

更多