当前位置: X题卡 > 所有题目 > 题目详情

A sight glass is installed in the liquid line to indicate the condition of the refrigerant charge a...

查看本题答案

你可能感兴趣的试题

the compressor short cycling on high pressure cut out switch  high suction pressure  high head pressure  bubbles in the sight glass  
rudder will respond sluggishly  hydraulic rams will over-speed  sight glass will show bubbles  ram relief valves will lift  
frosting of the liquid line  higher than normal head pressure  a clear sight glass  abnormally cold reefer boxes  
sight glass  weighing the extinguisher  service technicians report  last date it was charged"  
glass;glasses;glasses    glasses;glass;glass    glasses;glasses;glass    glass;glasses;glass  
installed    installing    to be installed    having installed  
the pump over-speeding  an improper rudder response  bubbles in the sight glass  ram relief valves lifting  
activate the driers  change color  secure the compressor  add a predetermined amount of liquid drier  
air bubbles in the sight glass  any leaks in the system  over-travel in the rudder angle indicator  lost motion in the rams  
Proper refrigerant charge  Faulty expansion valve  Insufficient refrigerant  Solenoid valve stuck open  
could not possibly reduce the installed capacity of conventional power stations  might not reduce the installed capacity of conventional power stations  would automatically reduce the installed capacity of conventional power stations  would make it necessary to reduce the installed capacity of conventional power stations  
install  to install  to be installed  installed  
high pressure liquid line  low pressure liquid line  high pressure vapor line  low pressure vapor line  
too much refrigerant in the system  oil entrained in the refrigerant  less than a full charge of refrigerant in the system  ice crystals forming in the refrigerant  
在Installed Base场景主张完全新建PTN平面  选项说法均正确  在Installed Base场景主张逐步培育PTN平面  在非Installed Base场景主张新建PTN平面  
be clear  be blue  be light green  show bubbles  
used in either the fully dosed or fully opened position  installed with the stem down  used for steam service only  used to throttle or regulate the flow of liquid  