During a project the scope of a product purchased on a cost reimbursable contract has increased. In ...

查看本题答案

你可能感兴趣的试题

the project specification that includes design principles and project objectives  a three-level project work breakdown structure  the process of creating a project scope management plan  the record showing that all project deliverables are completed satisfactorily  
concept phase  development phase  execution phase  close-down phase  
the sub-project level  the level determined by the project office  a level allowing for adequate estimates  the cost center level  
initiation (authorizatio, charter  initiation (authorizatio, scope statement  scope definition, scope statement  scope planning, charter  
At the end of the project  At the beginning of the project  During each phase of the project  During planning  
initiation (authorization), charter  initiation (authorization), scope statement  scope definition, scope statement  scope planning, charter  
Project acceptance  Scope verification  Scope definition  WBS Creation  
scope control and scope verification  direct and manage project execution and integrated change control  develop project management plan and develop project charter  develop project management plan and schedule development  
now becomes the new schedule, including the changes, and the original baseline is disregarded  is still the original baseline but annotated to reflect that a change has taken place  is amended to reflect the scope change, but the original baseline is still maintained for post-project review  is meaningless since every schedule update changes the baseline  
a scope management plan is created to document how the project scope will be defined, verified and controlled  a project management plan is developed  specific activities that need to be performed to produce the various project deliverables are determined  none of the above  
Project acceptance  Scope verification  Scope definition  WBS Creation  
Collect Requirements  Validate Scope  Control Scope  Create WBS  
Scope Planning  Scope Verification  Scope Change Control  Scope Definition  
Project acceptance  Scope verification  Scope definition  WBS Creation  
Check the work completed against the correct scope statements  Review the scope of work with the stakeholders  Document the inconsistencies to management, calculating the cost of nonconformance  Stop all activities until the scope of the work complete  
create a project scope statement  confirm that all the stakeholders have had input into the scope  analyze project risk  begin work on a project management plan  
constraints  project charter  budget/cost analysis  product description  
Scope Planning  Scope Verification  Scope Change Control  Scope Definition  
identify and document business needs  create a project scope statement  divide large projects into phases  accumulate and evaluate historical information  
now becomes the new schedule,including the changes,and the original baseline is disregarded  is still the original baseline but annotated to reflect that a change has taken place  is amended to reflect the scope change,but the original baseline is still maintained for post-project review  is meaningless since every schedule update changes the baseline  