当前位置: X题卡 > 所有题目 > 题目详情

Preliminary estimation puts the figure at around $ 110 billion, ____________ the $ 160 billion the P...

查看本题答案

你可能感兴趣的试题

The ships own wind instrumentation  Personal observation  Local conditions  Weather forecasts"  
Integration involves effectively integrating processes among the projec  Integrated change control includes reviewing and approving all change request  The project preliminary scope statement provides a high level scope narrativ  The project management plan is an input in developing the preliminary project scope statemen  
primary  preliminary  direct  primitive  
in proportion to  in reply to  in relation to  in contrast to  

The preliminary design is an internal document used only by programmers  The preliminary design is the result of mapping product requirements into software and hardware functions  The preliminary design of the product comes from the requirement specification  The developers produce the preliminary design by defining the software structure in enough detail to permit coding  

puts down  puts up  puts off  puts away  
resuh  judgment  estimation  even  
result  assessment  estimation  sources  
puts up    puts off    puts away    puts on  
parametric estimation  create WBS  feasibility analysis  benefit-cost analysis  
The preliminary design is an internal document used only by programmers  The preliminary design is the result of mapping product requirements info software and hardware functions  The preliminary design of the product comes from the requirement specification  The developers produce the preliminary design by defining the software structure in enough detail to permit coding  
an estimation  a share  a memento  a preview  
The preliminary design is an internal document used only by programmers  The preliminary design is the result of mapping product requirements into software and hardware functions  The preliminary design of the product comes from the requirement specification  The developers produce the preliminary design by defining the software structure in enough detail to permit coding  
takes on      puts on    carries on    gets on  
sketch  rough  preliminary  draft  
result  judgement  estimation  event  
more than half a million  at least 24 000  at least 80 000  more than a million  
The preliminary design is an internal document used only by programmers  The preliminary design is the result of mapping product requirement into software and hardware functions  The preliminary design of the product comes from the requirement specification  The developers produce the preliminary design by defining the software structure in enough detail to permit coding  

热门试题

更多