当前位置: X题卡 > 所有题目 > 题目详情

(1) is used to ensure the confidentiality, integrity and authenticity of the two end points in th...

查看本题答案

你可能感兴趣的试题

Certificate  Encryption  Tunnel  Presentation  
Ⅰ +Ⅱ  Ⅰ +Ⅲ  Ⅱ+Ⅲ  Ⅰ +Ⅱ+Ⅲ  
secure  relation  script  strict  
Certificate  Encryption  Tunnel  Presentation  
ballast water  boiler water  bilge water  sewage water  
IPSec  SSL  L2TP  The Internet Key Exchange  
15 liters/ nautical mile  30 liters/ nautical mile  60 liters/ nautical mile  100 liters/ nautical mile  
authenticity  IPSec  confidentiality  integrity  
Boiler  Incinerator  Oily water separator  Sewage treatment unit  
It is a technique that allows development of an optimum project schedule when resources are unlimite  It is a technique that modifies the project schedule to account for limited resource  It is another name for the bar char  It is primarily used to ensure safety in major construction project  
Certificate  Encryption  Tunnel  Presentation  
Consider overtime work as part of the jo  Prepare a cost baselin  Use earned value management to monitor performanc  Estimate and budget controllable and uncontrollable costs separatel  
Certificate  Encryption  Tunnel  Presentation  
characteristics  associated links  digital certificates  attributes  
ensure all machinery which may be used during maneuvering is in ready  ensure an adequate reserve of power is available for steering gear and otherrequirements  keep the main propulsion unit controls continuously attended when in the manual modeof operation  ensure all machinery which may be used during maneuvering is running stably  
Certificate  Encryption  Tunnel  Presentation  
to pump off  being pumped  pumping out  it pumping out  
estimating future projects  changing the project scope  defining future project tasks  validating the quality process  
the name of the crane operator  an entry each time the crane is used  date and result of each rated load test  the time of day of the test"  
used to ensure that the description of the project product is correct and complete  the creation of the work breakdown structure  the set of procedures developed to assure that project design criteria are met  a mechanism to track budget and schedule variances  

热门试题

更多