当前位置: X题卡 > 所有题目 > 题目详情

The first part of Subway Line 15     in Beijing in 2010.(  ) A.is built B.was built C.builds D.bui...

查看本题答案

你可能感兴趣的试题

opened  was opened  being opened  to be opened  
opened    was opened    being opened    to be opened  
lengthening the existing 53-kilometer subway is among the 50 large projects  the length of the subway will be up to 135.25 kilometers in 2005  a 40.5-meter-long line will be added to Beijing's first light railway  a 70-meter-wide green belt will supply us with enough water  
opened  was opened  being opened  to be opened  
to be finished    finished    having fished    finishing  
being opened    was opened    opened    to be opened  
would be put    was put    will be put    is put  
a production line where each worker does only a small part of work to complete a product  a house where many cars could be built in a single day  a place where Henry could limit himself to the few tools for the task  a workshop where the Model T was first produced in 1913  

热门试题

更多