你可能感兴趣的试题
precaution measures safety measures security measures emergency response measures
send a requisition list to the supplier check that whether the items ordered have been already delivered make the chief engineer on sport follow a preset procedure
vidibility ability reliability Capability"
alternative selection preference substitute
starting air pressure scavenge air pressure over-speed trip banjo oiler line
take a further inspection in the voyage check and repair, then retrial do as the surveyor ’s requirement retrial
check in for check on check out check off
engine room logbook voyage logbook engine room logbook or voyage logbook engine room logbook and voyage logbook
must check should check must have checked should have checked
which the sudden operational failure that the sudden operational failure the sudden operational failure the sudden operational failure of which
check hydraulic oil levels every hour check the rams for overheating check for excessive oil leakage from rams drain water from telemotor cylinders each watch
diametrical tension gap clearance radial thickness face thickness
check the pyrometer readings check the crankcase oil level check the fuel oil strainers clean the fuel system
noted by the bridge officer told by last duty engineer observed in the instruction manual
visibility ability reliability capability
A project is constrained by limited resources and operational works generally have no such constraint Projects and operations differ primarily in that operations are ongoing, projects are temporar Projects are different because the project conclueds when its specific objectives have been attained, while operations are repetitiv Operational works are not defined as a projec
bunker at a normal rate check for kinks in hose close valves slowly shut valves before topping off