你可能感兴趣的试题
Routine docking repair Voyage repair Damage repair Conversion
SEA WORTHINESS SEA TRIALS TRIAL-AND-ERROR DOCK TRIALS
had been proved was proved had proved proved
the port of destination the port for bunkering the port of arriva the last port of call"
travel tour journey voyage
starting and direction changing trial cancelling accelerating function trial lowest stable speed trial continuous running trial
take a further inspection in the voyage check and repair, then retrial do as the surveyor ’s requirement retrial
starting running running-in direction changing
disassembled renewed measured regulated
During annual repair Usually during dock repair Before sea trial After 5 years from last annual survey
Sea trial Bed-test Engine performance PSC inspection
During the sailing Prior the sailing After sailing Before the pilot is leaving
voyage repairs routine docking damage repairs conversion