当前位置: X题卡 > 所有题目 > 题目详情

_____ should be tested and adjusted when the boiler survey is carried out.

查看本题答案

你可能感兴趣的试题

was tested   will be tested   has been tested   is being tested  
is being tested  will be tested   was tested  has been tested  
was tested    will be tested    is being tested    has been tested  
was tested    will be tested    is being tested    has been tested  
was tested    will be tested    is being tested    has been tested  
soap hardness  nitrogen content  chloride content  dissolved CO2  
fire fighting pump  the steering gear  life boat engine  the main engine  
dissolved oxygen  chlorides  sludge  dissolved nitrogen  
tested lacking  having been tested to lack  tested lacked  to have been tested lack  
put back in service if some CO2 remains  hydrostatically tested  retagged  recharged"  
was tested    will be tested    is being tested    has been tested  
total dissolved solids  salt contamination  water hardness  chlorine contamination  
tested    to be tested    being tested    will be tested  
tested lacking  having been tested to lack  tested lacked  to have been tested lack  
The overall condition of the bearing surface should be examined  The shaft liner should be inspected for cracks and tested to insure a tight fit  The stern tube should be tested for cracks with dye penetrant  all of above  
was tested    will be tested    is being tested    has been tested  
both meters in series with the resistance  both meters in parallel with the resistance  the ammeter in series and the voltmeter in parallel with the resistance  the ammeter in parallel and the voltmeter in series with the resistance  
was tested  will be tested  is being tested  has been tested  
completed  carried out  cleaned  steamed  

热门试题

更多