当前位置: X题卡 > 所有题目 > 题目详情

Tool for defining activities is ______.

查看本题答案

你可能感兴趣的试题

Dependency Determination  Precedence Diagramming method  Rolling Wave Planning  Schedule network Templates  
kept up    held up    tool up    made up  
architecture analysis and design  domain analysis and static modeling  visualization and interaction  user requirements modeling  
What a    How    What an    How an  
database normalization  schema definition  database optimization  view fusion  
measure, delay, record, distribute, analyze, and direct  plan, schedule, monitor, control, report, and forecast  promote, highlight, monitor, control, forecast, and report  emphasize, visualize, analyze, conceptualize, report, and record  
Dependency Determination  Precedence Diagramming Method  Rolling Wave Planning  Schedule Network Templates  
measure, delay, record, distribute, analyze, and direct  plan, schedule, monitor, control, report, and forecast  promote, highlight, monitor, control, forecast, and report  emphasize, visualize, analyze, conceptualize, report, and record  
Rational Clearcase  Quality Function Deployment  Visual SourceSafe  Concurrent Versions System  
actors and usecases  processes and data  elements and relations  schemas and tables  
rule    excuse   order    tool  
Rational Clearcase  Quality Function Deployment  Visual SourceSafe  Concurrent Versions System  
the; the    不填; a    不填; the    a; a  
Reverse engineering  Information extraction  Requirements analysis  Sourcecode analysis  
Rational Clearcase  Quality Function Deployment  Visual SourceSafe  Concurrent Versions System  
a, an    an, a    a, a    an, an  
pattern definition and recognition  architecture design and implementation  system architecture modeling  dynamic modeling and reconstruction  
Dependency Determination  Precedence Diagramming Method  Rolling Wave Planning  Schedule Network Templates  

热门试题

更多