increase the time allowed on those tasks that have float try to increase expenditures of time on only those tasks that are behind schedule replace those workers that are not performing up to par with the busy workers increase work efforts on those tasks that are on the critical path
social educators' authority. children' rebellion. psychologists' misguidance. parents' confusion.
the critical path is reduced the contingency is no longer available no float time is available project resources are reduced
most critical in a four-stroke cycle diesel engine most critical in a two-stroke/cycle diesel engine most critical in a four-stroke/cycle diesel engine if it is turbocharged of equal importance in a two-stroke/cycle diesel engine as in a four-stroke/cyclediesel engine
A critical resource went on sick leave for a long period of time, which had not been anticipated earlier. The Cost of raw materials required for construction increased 10%. You had not taken into account inflation rate. There was 4 days waiting time in the curing of cement, and work could not be done during that time.
acting as a sounding board for clarification of critical issues establishing administrative policies outlining time, cost and performance constrains identifying and developing mitigation strategies for areas of risk
(a+3m+b)/6 (a+4m+b))/6 (a+5m+b)/6 (a+m+b)/3 Note: A major assumption for all network methods is that activity durations are statistically dependent and where a=most optimistic time, b=most pessimistic time, m=most likely time.
hose joints are made up tanks are being topped off system is being lined up pumping operation is first started
lining up the systems topping off starting delivery connecting hoses and joints
critical about indignant at indifferent to subject to